Risk Assessment & Method Statement
Trade: Scaffolders · Generated 17/07/2026
1. Scope of works
Erection, alteration and dismantle of tube-and-fitting or system scaffold to TG20:21 / SG4:22.
2. Method statement
- Site induction and RAMS briefing signed by all operatives before work starts.
- Set up welfare, first-aid kit and fire point. Confirm nearest A&E.
- scaffolders team collects materials from designated laydown area — no interference with other trades' zones.
- Isolate, lock off and prove dead any services (electric, gas, water) in the work zone.
- Carry out task in accordance with method statement and manufacturer instructions.
- Housekeeping at end of each shift — waste segregated, walkways clear, tools tethered or stored.
- End-of-day sign-off with photo evidence uploaded to project record.
3. Hazards, persons at risk & control measures
| Hazard | Who is at risk | Control measures |
|---|---|---|
| Falls during erection/dismantle | Scaffolders | Advance guardrail system. Harness clipped to scaffold tube during lifts. |
| Falling components | Public, site crew | Exclusion zone, banksman, no throwing tubes/boards. |
| Overhead power lines | Scaffolders | GS6 clearance. DNO consulted if within 6m of LV / 15m of HV lines. |
| Manual handling — tubes, boards, fittings | Scaffolders | Two-person handling of >6m tubes. Rest breaks. |
4. PPE required
- Safety helmet (EN 397)
- Safety footwear (EN ISO 20345, S3 minimum)
- Hi-vis vest (EN ISO 20471, class 2)
- Impact gloves (EN 388)
- Safety glasses (EN 166)
- Full-body harness with shock-absorbing lanyard (EN 361/355)
5. Legislation & guidance
- Health and Safety at Work Act 1974
- Construction (Design and Management) Regulations 2015
- Management of Health and Safety at Work Regulations 1999
- Work at Height Regulations 2005
- PUWER 1998
6. Approval
Prepared by (competent person)
Name / signature / date
Approved by (principal contractor)
Name / signature / date