RAMS template

RAMS template for Roofers

A UK-compliant Risk Assessment & Method Statement pre-filled for roofers. Edit the details for your site, then print or save as PDF.

Risk Assessment & Method Statement

Trade: Roofers · Generated 17/07/2026

1. Scope of works

Pitched and flat roofing works including strip, felt, tile and lead work at height.

2. Method statement

  1. Site induction and RAMS briefing signed by all operatives before work starts.
  2. Set up welfare, first-aid kit and fire point. Confirm nearest A&E.
  3. roofers team collects materials from designated laydown area — no interference with other trades' zones.
  4. Isolate, lock off and prove dead any services (electric, gas, water) in the work zone.
  5. Carry out task in accordance with method statement and manufacturer instructions.
  6. Housekeeping at end of each shift — waste segregated, walkways clear, tools tethered or stored.
  7. End-of-day sign-off with photo evidence uploaded to project record.

3. Hazards, persons at risk & control measures

HazardWho is at riskControl measures
Falls from heightAll roofersEdge protection to all leading edges. Roof ladders, crawl boards on fragile surfaces. Harness + running line as last resort.
Falling materialsPublic, ground crewDebris netting, exclusion zone, banksman when tipping.
Fragile surfaces (fibre cement, rooflights)RoofersAssume fragile until proven otherwise. Crawl boards, netting under. Never step on rooflights.
Weather — wind >23mph, ice, lightningAll roofersStop work above wind thresholds. Check forecast daily.

4. PPE required

  • Safety helmet (EN 397)
  • Safety footwear (EN ISO 20345, S3 minimum)
  • Hi-vis vest (EN ISO 20471, class 2)
  • Impact gloves (EN 388)
  • Safety glasses (EN 166)
  • Full-body harness with shock-absorbing lanyard (EN 361/355)

5. Legislation & guidance

  • Health and Safety at Work Act 1974
  • Construction (Design and Management) Regulations 2015
  • Management of Health and Safety at Work Regulations 1999
  • Work at Height Regulations 2005
  • PUWER 1998
  • HSG33 — Health and safety in roof work

6. Approval

Prepared by (competent person)
Name / signature / date
Approved by (principal contractor)
Name / signature / date

Store this in SiteClick — one place for RAMS, photos and daily reports.

Every operative signs on-screen, the version history is audit-ready, and the principal contractor gets a shareable link. 7-day free trial.

Start free trial